24P Trackless Train

24P Trackless Train
24P Trackless Train
24P Trackless Train
24P Trackless Train
24P Trackless Train
24P Trackless Train
24P Trackless Train

Technical parameters

A Quiet Train for Roofed Venues

Some of the best sites for a trackless train have a roof over them. Shopping malls, covered promenades, exhibition halls and family entertainment centres want the motion and the whistle, but they cannot accept diesel fumes or engine noise bouncing off a hard ceiling. The 5ST-13 answers that brief with batteries instead of a fuel tank.

No exhaust means no ventilation requirement, no smell drifting into a food court, and fewer complaints from neighbouring tenants. For operators weighing a train against local environmental rules, that single difference often settles the purchase.

One Locomotive, Four Carriages, Twenty-Four Riders

The consist is straightforward: one locomotive plus four carriages, carrying twenty-four passengers in total. The locomotive measures 3.15 m long, 1.15 m wide and 2.05 m high, and each carriage runs 1.80 m by 1.0 m by 2.0 m. Those dimensions matter when you are threading a route between kiosks and escalators rather than across open ground.

  • Pure battery power, with no fuel tank and no exhaust
  • Three-kilowatt motor for quiet, smooth acceleration
  • Laser-printed logos and graphics finished at the factory
  • FRP and steel body built for daily commercial use
  • Certified to CE standards and suitable for riders of any age

Venues that run both an indoor train and an outdoor one often split the workload, keeping the electric unit under cover and handing the perimeter roads to a diesel model such as the seventy-two-seat stop-and-go train or the high-capacity flagship train on larger loops.

Overnight Charging and the Daily Cycle

Five 12V/150A batteries store the energy, and a standard supply is enough to bring them back overnight. The practical rhythm is simple: charge after close, run the full day. A mall that opens at ten and shuts at ten needs a train that can work those hours without a mid-shift top-up, and the pack is sized for that duty.

Charging discipline is the one habit worth training: log every cycle and keep the charger dry.

Where Battery Power Changes the Planning

Electric drive removes some complications and adds a couple of others. Gone are fuel storage, refuelling logs and exhaust routing; in their place you plan a charging bay, a power point near the overnight parking spot, and a spare battery set if the venue keeps very long hours.

Customising Livery Before Production

Laser-printed graphics give a crisp result on both locomotive and carriages. Mall operators tend to carry centre branding; parks lean toward character faces and block colour. Seat layout, roof style and carriage count can be adjusted, and colours are matched to your palette before production.

Indoor entertainment centres often build a small ride cluster around the train, and a compact mini wheel is a common partner because it fits the same low headroom and quiet-operation constraints.

Technical Specifications

Product name

24P Trackless Train

Model Number

YTCN-5ST-13

Train Iocomotive

 3.15mLx1.15mWx2.05mH.

Carriage

 1.80mL*1.0mW*2.0mH.

Capacity

 24 Persons (1locomotive+4carriages)

Power

12V/150A*5pcs battery.

Motor

3KW

Logo/graphic design

 Laser Printing

Packaging

Export package

Material

FRP+steel

Certificate

 CE Certificate

Color

 Customized Color

Suitable age

 Any age

MOQ

 1 Set

Frequently Asked Questions

How long does a charge last?

Enough for a normal operating day when the pack starts full. Venues running very long hours may prefer a second battery set, so one charges while the other works.

Does it need special ventilation?

No exhaust is produced, so the ventilation demands of a diesel train do not apply. This is the main reason covered and indoor sites choose the battery model.

Can it run outdoors as well?

Yes. The FRP and steel body is finished for outdoor service, so the train can leave the concourse and complete a loop of the car park or garden.

What does the driver need to learn?

Controls are simplified for one operator, and training covers the charging routine, loading procedure and daily checks. Most teams are confident within the first week.

Is the graphics work done at the factory?

Logo and graphic design are applied by laser printing before shipping, so the train arrives fully finished rather than needing a local signwriter to match the brand.

Project process

  • 01 Production

  • 02 Shipping

  • 03 Installation

  • 04 Feedback

  • 05 Application Scenario

Production
01 Production

We source premium to guarantee durability and longevity, Skilled craftsmen and advanced robotics work in harmony to precision-cut, weld, and assemble components, before shipping will do the testing. From raw materials to production to testing, we fully control the quality.

Shipping
02 Shipping

Use the professional export package, the fiberglass use the three layer(Bubble film + non-woven fabric + stretch film), it will better protect the equipment. The workers have rich loading experience, reasonable use of container space to save freight for customers.

Installation
03 Installation

We have the professional installation team. The engineer has rich experience with installation, can guide the installation, formulate a reasonable installation plan and conduct routine maintenance training. Let customers save worry, trouble and money, and complete the project installation work faster and better.

Feedback
04 Feedback

Our team has cooperated with many government and private park projects. Our high-quality products and excellent services have won praise from customers. This is the feedback from one of the our government projects.

Application Scenario
05 Application Scenario

The equipment can be used in various scenarios, such as outdoor parks, shopping malls, indoors, etc. We can plan according to your site and make a 3D design drawing of the playground for you.

Customer Reviews

Customer Feedback
Customer Feedback 2

Company Strength

Yueton Company Strength
Yueton Company Strength 2
Yueton Company Strength 3
Yueton Factory

Contact Us

Error: Contact form not found.

Home WhatsApp Mail Inquiry