72P Trackless Train

72P Trackless Train
72P Trackless Train
72P Trackless Train
72P Trackless Train
72P Trackless Train
72P Trackless Train
72P Trackless Train
72P Trackless Train

Technical parameters

Running 72 Seats Through a Peak Weekend

A Saturday in high season puts a trackless train under pressure that a showroom never reveals. The gates open, families arrive in waves, and one vehicle is expected to shuttle guests from the far car park, then turn around and run a slower sightseeing loop through the middle of the park. The 5ST-04 was specified for that double duty.

Seventy-two seats in a single consist means fewer trips for the same crowd. When a queue builds at the entrance, capacity is the number that decides how fast it clears, and this is the largest configuration in Yueton's trackless range.

Where the 5ST-04 Earns Its Keep

Amusement parks, resort villages and large family entertainment centres tend to share one trait: a site big enough that walking it becomes a complaint. A train carrying seventy-two passengers at once does more than entertain. It moves people.

  • Seventy-two seats laid out for fast boarding and alighting
  • Chassis and drive rated for constant stop-and-go work
  • Seventy-litre fuel tank for long shifts between refuelling
  • FRP and steel body finished for outdoor service
  • Custom colours and logos matched to venue branding

Operators running a larger fleet often pair this model with the high-capacity flagship train, keeping one unit on the transport route while the other works the scenic loop. Where the site also depends on a single tall ride to pull crowds into one corner, the same shuttle logic applies around large landmark wheels.

Stop-and-Go Duty, Not Just Loops

The drivetrain is the part buyers underrate. A train circling a lake at constant speed leads an easy life. A train that stops every ninety seconds, loads a full platform and pulls away again does not. Brakes, steering and the drive system on the 5ST-04 are set up for the second kind of work.

Maximum speed is 20 km/h, which sounds modest until you watch a loaded train negotiate a crowded midway. The ceiling is a safety decision as much as a mechanical one.

Operator Notes: Loading, Fuel and Daily Checks

New teams usually settle in within the first week. Controls are simplified for single-operator use, and the daily routine is short: brakes, steering, fuel level and bodywork, followed by a slow test lap before the gates open.

Routes with steep gradients deserve a conversation before production. Send the site profile and the right power option is configured at the factory, rather than discovered on opening day. Sites that also run an electric shuttle for indoor or covered sections can compare notes with the battery-powered 24-seat train.

Technical Specifications

Product name

72P trackless train

Model Number

YTCN-5ST-04

Capacity

72P

Oil Box

70L

Max.Speed

20km/h

Packaging

Export package

Material

FRP+steel

Certificate

 CE Certificate

Color

 Customized Color

Installation

 professional installation pictures and videos or arrange staff install

Logo

 Customized Logo Availabled

MOQ

 1 Set

Frequently Asked Questions

How does the 5ST-04 differ from the other large train?

Both carry the same class-leading capacity. This one is tuned for venues that mix scheduled transport with tour rides, so the drivetrain is built for all-day stop-and-go durability.

Can the carriages be customised?

Yes. Carriage count, seat layout, roof style, colours and logos can all be adjusted to your route and your brand before production begins.

What about spare parts and maintenance?

Routine maintenance follows a short checklist covering brakes, steering, fuel and bodywork. Spare parts are stocked for export, so replacements reach overseas sites without a long wait.

Is CE certification included?

The model is CE certified and fitted with reliable braking and emergency controls, which matters to insurers and to local inspection teams reviewing a new ride installation.

Can one train handle both park transport and paid rides?

It can, and many venues use it that way. Set a timetable for the transport runs, then treat the sightseeing loop as the attraction, letting riders board and leave at marked stops.

Project process

  • 01 Production

  • 02 Shipping

  • 03 Installation

  • 04 Feedback

  • 05 Application Scenario

Production
01 Production

We source premium to guarantee durability and longevity, Skilled craftsmen and advanced robotics work in harmony to precision-cut, weld, and assemble components, before shipping will do the testing. From raw materials to production to testing, we fully control the quality.

Shipping
02 Shipping

Use the professional export package, the fiberglass use the three layer(Bubble film + non-woven fabric + stretch film), it will better protect the equipment. The workers have rich loading experience, reasonable use of container space to save freight for customers.

Installation
03 Installation

We have the professional installation team. The engineer has rich experience with installation, can guide the installation, formulate a reasonable installation plan and conduct routine maintenance training. Let customers save worry, trouble and money, and complete the project installation work faster and better.

Feedback
04 Feedback

Our team has cooperated with many government and private park projects. Our high-quality products and excellent services have won praise from customers. This is the feedback from one of the our government projects.

Application Scenario
05 Application Scenario

The equipment can be used in various scenarios, such as outdoor parks, shopping malls, indoors, etc. We can plan according to your site and make a 3D design drawing of the playground for you.

Customer Reviews

Customer Feedback
Customer Feedback 2

Company Strength

Yueton Company Strength
Yueton Company Strength 2
Yueton Company Strength 3
Yueton Factory

Contact Us

Error: Contact form not found.

Home WhatsApp Mail Inquiry