F1 Flying Car

F1 Flying Car
F1 Flying Car
F1 Flying Car
F1 Flying Car
F1 Flying Car
F1 Flying Car
F1 Flying Car

Technical parameters

Cycles per Hour: Eight-Seat Turnover on a Three-Metre Racing Ride

Eight seats per cycle is the number that sets everything else. Add load and unload time, a short safety check and the ride itself, and a well-run 5FR-05 turns over roughly ten to twelve cycles an hour at a steady pace - around 80 to 96 rides from a single unit. That is the figure to use when you model payback.

The queue lane should hold one full cycle plus a margin. Racing-themed rides attract groups of friends who all want to ride together, so the lane needs to absorb a pod of eight arriving at once, not a trickle of single riders. Wide gates and a clear step-in point keep each cycle close to its planned time.

Power and Phase Load: Running a 3.2kW Racing Ride on 220V or 380V

Power draw is 3.2kW at 220/380V, which is modest for a ride with real motion. On a 220V single-phase supply it fits most small venues without a transformer upgrade; on 380V three-phase it runs cooler and suits a site already wired for other rides. Confirm your supply before ordering, because it decides the drive configuration.

At 3.2kW, energy cost stays a small line in the operating budget - the meaningful costs are labour, ticketing and maintenance. Two or three attendants cover loading, height checks and the control panel comfortably. Venues that split duty between attractions often pair this with a 3P carousel ride in the younger zone, so the same team covers both.

Ground Area and Queue Layout for a Racing Ride: Six by Nine Metres

The covered area is 6 by 9 metres, with a height of 3m. That footprint fits a shopping centre atrium, a covered mall court or a mid-size amusement floor without eating the whole space. Leave the perimeter clear for a queue rail on one long side and a service approach on the other.

Prepare level, drained ground and a foundation per the drawings, then keep the loading gate on the side facing your foot traffic. A ride that loads from behind a corner wastes attendants. Family entertainment centres with more than one track-based attraction commonly add a fire brigade track train ride nearby, since both load quickly and share a ticketing point.

Repeat Rides and Zone Siting: Racing Themes That Pull a Second Turn

Racing appeals to a wide age band, and that is what makes repeat rides happen. A rider finishes and immediately wants a faster lap or a better seat, which is the cheapest revenue in the building. Price a single ride and a three-ride band, and put the band price where people queue rather than at the ticket desk alone.

Site the unit where the racing styling is visible from a distance. Bright race bodywork photographs well and pulls passing footfall on its own. Keep the F1 zone away from toddler areas, since the theme sets an expectation of speed that suits older children and teenagers better than very young riders.

Downtime Budget on a Racing Ride: Servicing FRP Bodywork and Steel Frames

Bodywork is FRP over a steel frame, which keeps weight down and repairs simple. Plan a daily walk-round on the seats, restraints and motion arms, a monthly check of bolts and bearings, and a full inspection before each high season. Most operators lose more revenue to small faults than to major failures, so the walk-round matters most.

Keep a spare set of restraints and a touch-up kit for the customized colour on site; a scuffed race car stops looking like a race car within a few months in heavy use. Log every fault with the date - on a ride running a hundred cycles a day, the pattern in the logbook is what tells you a component is wearing out.

Technical Specifications

Product name

F1 Flying Car

Model Number

YTCN-5FR-05

Capacity

 8P

Height

3m

Power

3.2kw,220/380V

Cover Area

6*9m

Packaging

Export package

Material

FRP+steel

Certificate

 CE Certificate

Color

 Customized Color

Installation

 professional installation pictures and videos or arrange staff install

Logo

 Customized Logo Availabled

MOQ

 1 Set

Frequently Asked Questions

Why does a racing theme work so well on a ride?

Cars and racing are a near-universal childhood interest, and adding flight to that doubles the appeal for the rider. It also gives the ride a clear identity that parents recognise instantly when choosing what to queue for, which is why the F1 zone pulls footfall from across a venue.

How many guests can ride per hour?

Eight riders per cycle at roughly ten to twelve cycles an hour, so about 80 to 96 rides. Loading speed decides that range more than the ride itself - two attendants working the gates will keep it at the top end during your busiest sessions.

What power supply is needed?

The unit draws 3.2kW at 220/380V. A single-phase 220V supply suits most small and mid-size venues, while a 380V three-phase supply is the better choice where the site is already wired for it. Confirm your supply before the drive is configured.

How much floor space does it need?

The covered area is 6 by 9 metres with a 3m height. Add a queue lane on the loading side and a clear service approach on the opposite side. Ground must be level and drained, with the foundation built to the supplied drawings.

Is it suitable for children?

It fits family venues and works for a broad age mix, with height and supervision rules applied as standard practice. The unit is CE certified, colours and logo are customized, and the minimum order is one set. Post the rules at the boarding gate so parents can check before joining the queue.

How is the ride installed and maintained?

Professional installation pictures and videos are supplied, or our staff can be arranged to attend the site. Daily checks cover seats and restraints, monthly checks cover bolts and bearings, and a full inspection before peak season keeps downtime predictable. Keep a spare set of restraints on site.

Project process

  • 01 Production

  • 02 Shipping

  • 03 Installation

  • 04 Feedback

  • 05 Application Scenario

Production
01 Production

We source premium to guarantee durability and longevity, Skilled craftsmen and advanced robotics work in harmony to precision-cut, weld, and assemble components, before shipping will do the testing. From raw materials to production to testing, we fully control the quality.

Shipping
02 Shipping

Use the professional export package, the fiberglass use the three layer(Bubble film + non-woven fabric + stretch film), it will better protect the equipment. The workers have rich loading experience, reasonable use of container space to save freight for customers.

Installation
03 Installation

We have the professional installation team. The engineer has rich experience with installation, can guide the installation, formulate a reasonable installation plan and conduct routine maintenance training. Let customers save worry, trouble and money, and complete the project installation work faster and better.

Feedback
04 Feedback

Our team has cooperated with many government and private park projects. Our high-quality products and excellent services have won praise from customers. This is the feedback from one of the our government projects.

Application Scenario
05 Application Scenario

The equipment can be used in various scenarios, such as outdoor parks, shopping malls, indoors, etc. We can plan according to your site and make a 3D design drawing of the playground for you.

Customer Reviews

Customer Feedback
Customer Feedback 2

Company Strength

Yueton Company Strength
Yueton Company Strength 2
Yueton Company Strength 3
Yueton Factory

Contact Us

Error: Contact form not found.

Home WhatsApp Mail Inquiry