






Ask any operator what kills a bungee trampoline and the answer is rarely the idea. It is the third season: the frame that starts flexing, the cords that stretch unevenly, the mat that has been jumped on by two hundred children a day since Easter. The YTCN-5BT-06 is built for that venue rather than for a weekend fair.
The structure uses FRP and steel, stands 6.5m, and covers a 9*9m area with a capacity of 4P and a 4KW power draw. Those figures are the same as a lighter unit on paper. The difference shows up in how the joints are welded, how the base is anchored and how much material sits behind every load point.
After running these machines in busy parks, we know the sequence. Harness webbing goes first, then the elastic cords, then the mat stitching, then the paint on the highest platform where children grip. Everything else lasts years.
Keeping spares on site matters more than any specification sheet. A ride that is down for two weeks waiting on a part costs more than the part ever will.
Salt air is the hard test. A promenade operator in a humid coastal town runs from ten in the morning until midnight in summer, and the unit sits outdoors between shifts. In that setting, rinse the frame monthly, keep the control cabinet sealed, and store harnesses indoors overnight. The steel and FRP structure handles the weather; the webbing and electronics are what need shelter.
Promenade sites also need a wind plan. Agree a cut-off speed with your safety officer and write it into the operating procedure. Venues that also run inflatables should check our vivid inflatable slide for the same wind rules. If you run seasonal attractions too, a Christmas tree ride pairs well with a bounce point in the winter months.
|
Product name |
Bungee Trampoline |
|
Model Number |
YTCN-5BT-06 |
|
Capacity |
4P |
|
Height |
6.5m |
|
Power: |
4KW |
|
Cover Area: |
9*9m |
|
Packaging: |
Export package |
|
Material |
FRP+steel |
|
Certificate |
CE Certificate |
|
Color |
Customized Color |
|
Suitable age |
Over 3 years old |
|
Installation |
professional installation pictures and videos |
|
Logo |
Customized Logo Availabled |
|
MOQ |
1 Set |
Two to three minutes is the usual commercial answer. Long enough that a child feels they got a real turn, short enough that the queue keeps moving on a busy afternoon. Write the time on a board, use a timer, and apply it to everyone, so staff never have to negotiate with a parent mid-session.
One trained operator can run a single unit safely at quiet times. On weekends and holidays, two people work better: one harnesses and launches, one manages the queue and watches the landing zone. That second person also handles the questions from parents, which keeps the operator focused on the harness.
Less than the moving parts. Check the anchor bolts each month, look for paint damage on the steel, and confirm the platform joints have not worked loose. The FRP panels need a wash rather than a coating. Write the checks on a single sheet and sign it, because a maintenance log is what inspectors ask for first.
It is designed to be installed and kept in place, though it can be dismantled and moved with the right lifting gear. Venues that tour fairs usually accept that as a seasonal job with a day of setup. If you need something that moves weekly, say so before ordering, because the base design changes.
The unit draws 4KW, so it needs a dedicated circuit with an isolator near the operator's position. Have a qualified electrician terminate the supply and test the earth before the first session. Never run it from a shared ring main, and never from a generator that is also feeding lighting and sound.
Production starts after your order and colour confirmation, then the set ships in export packing. Setup itself is quick once the ground is level and the base is fixed. We supply professional installation pictures and videos, and most crews complete the assembly on a clear site within a day or two.
01 Production
02 Shipping
03 Installation
04 Feedback
05 Application Scenario

We source premium to guarantee durability and longevity, Skilled craftsmen and advanced robotics work in harmony to precision-cut, weld, and assemble components, before shipping will do the testing. From raw materials to production to testing, we fully control the quality.

Use the professional export package, the fiberglass use the three layer(Bubble film + non-woven fabric + stretch film), it will better protect the equipment. The workers have rich loading experience, reasonable use of container space to save freight for customers.

We have the professional installation team. The engineer has rich experience with installation, can guide the installation, formulate a reasonable installation plan and conduct routine maintenance training. Let customers save worry, trouble and money, and complete the project installation work faster and better.

Our team has cooperated with many government and private park projects. Our high-quality products and excellent services have won praise from customers. This is the feedback from one of the our government projects.

The equipment can be used in various scenarios, such as outdoor parks, shopping malls, indoors, etc. We can plan according to your site and make a 3D design drawing of the playground for you.






Error: Contact form not found.