An outdoor amusement park in Tunisia has opened, delivered and installed by Zhengzhou Yueton. Here is what this project looked like from the supply side, and how a buyer can start a similar one.
An outdoor amusement park usually starts with your site area, the rides you want, and your budget. From there we supply the complete package — the rides, park layout support, export documentation, and on-site installation.
For this Tunisia project our engineers were on site from May 8 to install and commission the equipment. The park has now opened, and all equipment passed the local safety inspection.
If you are planning an outdoor park, tell us your site area, the rides you want, and your budget. We will prepare the layout, the equipment package, export documentation, and on-site installation support, then send you a quote.
Contact us to begin.
42m Ferris Wheel Installation in Indonesia
24/07/2025Nicaragua Government Park Project
25/03/2025Libya Amusement Park Project
21/01/2025How To Choose And Install Bumper Car?
15/11/2024How To Invest In An Amusement Park Correctly?
14/10/2024The Installation Of Brave Turntable Ride In Indonesia
07/09/2024Zhengzhou Yueton Amusement Equipment Co., Ltd.’s Major Progress In Africa
30/08/2024Luxury Model Trackless Train
23/08/2024Yueton Amusement at Bangladesh Exhibition
07/12/2022