Custom Ride Design: From Site Constraints to Final Layout

In short: Custom design means fitting the ride to five hard constraints - site, regulation, budget, throughput and maintenance - in seven steps from site data to layout.

Custom does not mean anything you want

A buyer often arrives with a picture: a coaster over a lake, a wheel beside a mountain. Sometimes that picture is buildable. Often it is buildable only after something else changes — the budget, the site, or the ride type.

The most expensive mistake in park design is choosing equipment before understanding the site. A ride that does not fit leaves you with three bad options: move the ride (redesign), shrink the ride (new calculation), or accept a layout that nobody will enjoy operating.

The right order is: site and visitor profile first, ride mix second, models third. Everything on this page follows that order.

The five constraints that decide the design

ConstraintWhat it fixesWhat it rules out
SiteAvailable footprint, terrain, soil bearing capacity, access roads, height limit, neighbouring structuresRides that need more room, deeper foundations or a taller clearance than the site allows
RegulationGoverning standard, local approval route, required certification, language of documentationDesigns that pass EN 13814 but fail a local requirement — or the reverse
BudgetTotal investment including civil works, foundations, installation and sparesRide types whose civil works alone exceed the budget
ThroughputVisitors per day, peak-hour factor, dwell time per ride Under-sized rides that queue, over-sized rides that sit idle
MaintenanceLocal technical staff, spare-part access, power stability, climateRides that need skills or parts the operator cannot sustain

Notice that four of the five have nothing to do with the ride model. That is the point: by the time the model is chosen, most of the design is already decided.

How we size a ride mix

Throughput is where most park plans go wrong, in both directions. This is the calculation we run before recommending any model.

Step 1 — peak-hour visitors

Take the target daily visitors and divide by operating hours, then apply a peak factor. A park targeting 3,000 visitors over 8 hours with a weekend peak factor of 2.5 needs to handle roughly:

3,000 ÷ 8 × 2.5 ≈ 940 visitors per peak hour

Step 2 — hourly capacity of one ride

Capacity per hour depends on cycle time, not on how many seats exist:

hourly capacity = (3,600 ÷ cycle seconds) × seats × load factor

For an observation wheel with 36 cabins × 6 seats, a 12-minute cycle and a realistic 80% load factor:

(3,600 ÷ 720) × 216 × 0.8 ≈ 864 visitors per hour

One wheel therefore absorbs most of a 940-per-hour peak. A ride with a 3-minute cycle and 24 seats carries only about 384 per hour — three of them would be needed to match the wheel. These figures are worked examples: use the actual parameters of the model you are offered.

Step 3 — the mix, not the single ride

Visitors do not all want the same ride, so the mix is balanced by age group and by intensity: one anchor ride, two to four family rides, a children’s zone, and one or two high-thrill units. The anchor carries the queue; the smaller rides spread the crowd and increase dwell time.

If you send us your target visitor numbers and site dimensions, we will run this calculation for your site — including the option you did not ask about, because a smaller anchor plus more family rides is often the better business case.

The design process, step by step

#StepWhat happensTypical time
1Site data & briefYou send dimensions, terrain, photos, budget range and target visitors. We confirm what is missing.1-3 days
2Concept layoutRide selection, 2D layout, initial throughput estimate, indicative budget split.3-5 working days
3Feasibility checkFoundation and soil assumptions, power capacity, access and evacuation routes, height and clearance limits against local rules.1-2 weeks
4Scope freeze & quotationFinal ride list, civil works boundary (who builds what), payment schedule, delivery terms.1 week
5Detailed designStructural calculation, manufacturing drawings, foundation drawings, electrical schematics, operation manual outline.2-4 weeks
6ProductionRuns against the seven quality control points; photo updates at each stage.30-75 days
7Installation & commissioningEngineer dispatch or remote supervision, trial run, staff training, handover of the quality file.2-4 weeks on site

The step that most projects underestimate is step 3. A concept layout takes days; checking whether the ground, the power supply and the local approval route actually support it takes weeks. Skipping it moves the discovery to the construction site, where changes cost ten times more.

Step 6 is not a black box either: the seven control points that production runs against are described in the seven quality control points, with the records each one produces.

What you need to send us

The faster this list is complete, the faster the first layout is useful rather than decorative.

  • Site plan — dimensions, boundaries, existing structures, access roads. A hand sketch with measurements is enough to start.
  • Terrain and ground — flat or sloped, and any soil report you already have. If none exists, we will tell you what to test.
  • Height and clearance limits — from local regulations or neighbouring buildings, whichever is tighter.
  • Target visitors — daily and peak, plus the visitor profile: families, teenagers, tourists, school groups.
  • Budget range — total investment, and whether civil works are inside it.
  • Power supply — available voltage, capacity, whether a transformer is needed.
  • Destination country — this decides the standard and the documentation language.
  • Local technical capability — do you have maintenance staff, and will you keep spare parts on site.

Where customization usually stops

Being clear about limits is more useful than promising everything. What we can change, and what we cannot, divides cleanly:

Freely customizableCustomizable with recalculationNot customizable
Colours and livery
Theme and character design
Cabin interior and seating finish
Lighting and audio
Signage language
Optional accessories
Track layout and route
Span and height (within the model family)
Seat count and cabin configuration
Foundation type
Control system brand
Safety clearances
Braking distance
Structural member sections (without a new calculation)
Maximum passenger load
Guard and restraint geometry

If a request lands in the third column, the answer is not “no” — it is “that is a new design, and here is what it costs”. A ride whose structure is changed without recalculating the load cases is no longer the ride that was certified.

Standard model or custom?

Standard modelCustom design
CostLower — drawings and tooling already existHigher — design and tooling are project-specific
Lead timeShorterLonger by the design phase
Spare partsStocked, interchangeableModel-specific, we keep tooling and drawings for 10 years
Fit to siteSite must adapt to the rideRide adapts to the site
Best whenThe site is regular, the budget is fixed, the park needs to open fastThe site is irregular or constrained, or the park needs a signature attraction

Many projects are a mix: standard models for the family and children’s zones, one custom anchor. That is usually the best use of the budget — the anchor creates the identity, the standard rides carry the throughput.

Whichever route you take, the structure behind it goes through the same verification — see how the structure is verified.

Frequently asked questions

How long does a custom design take from first contact to operation?

Typically four to seven months: two to four weeks for concept and feasibility, two to four weeks for detailed design, 30-75 days of production, and two to four weeks on site. Civil works usually run in parallel with production and are often the critical path.

Can you design around an existing building or an irregular plot?

Yes, and it is one of the most common requests. Send the plan with dimensions and any height restrictions; the constraint usually changes the ride type rather than preventing the project.

Can I change the theme after the design is approved?

Theme, colours and cabin finish can be changed later with limited impact. Anything that affects structure, clearances or passenger load cannot — that requires a new calculation and a new approval.

Do you provide the civil works?

We provide foundation drawings and load data. Local civil works are normally built by a local contractor to our drawings, which is cheaper and simpler than importing a crew. We review the foundation before the ride arrives.

Who approves the design in my country?

Local approval is the operator’s responsibility, but we provide the documentation that approval requires: calculation report, drawings, material certificates and test records. Tell us the destination country at inquiry stage so the design follows the right standard from the start — see which standard applies to your country.

What if my budget is below the concept we discussed?

Then we change the mix, not the safety. Removing a ride, reducing seat count within the same model family, or phasing the park in two stages are all normal outcomes. What we will not do is reduce structural sections to hit a price.

Can you match a ride I saw at another park?

We can design a ride of the same type and capacity. We do not copy a competitor’s protected design, and we will tell you when a request crosses that line.

Back to the engineering overview →