In short: Five 72-seat Cummins diesel trains for a Brazilian government project have finished production, built as one batch with a single spare-parts list.
Zhengzhou Yueton has made significant progress on a government project with a Brazilian client, completing production of five 72-seat Cummins diesel-powered trains, with shipment scheduled.
For high-capacity transport trains, we engineer, manufacture, and deliver complete units.
A 72-seat train covering a long route cannot depend on a battery charge between circuits. Cummins diesel power removes the charging window and the cable infrastructure entirely, which matters where the track is laid out over a large site or where the power supply at the far end is unreliable. The cost moves to fuel and engine servicing, and for a government-operated park that is a budget line the operator already knows how to run.
Five identical trains built together means one set of drawings, one production run and one shipment. It also means the operator starts with a fleet of the same machine, so drivers and mechanics learn one vehicle rather than five, and the spare-parts list stays short.
Five identical diesel trains mean one service schedule, one spare-parts list and one training programme for the operator’s mechanics. For a public-sector buyer that consistency is often worth more than a lower purchase price per unit, because the fleet has to be maintained by staff who may not have worked on amusement equipment before.
Nicaragua Government Park Project
25/03/2025How To Choose And Install Bumper Car?
15/11/2024How To Invest In An Amusement Park Correctly?
14/10/2024The Installation Of Brave Turntable Ride In Indonesia
07/09/2024Zhengzhou Yueton Amusement Equipment Co., Ltd.’s Major Progress In Africa
30/08/2024Luxury Model Trackless Train
23/08/2024Yueton Amusement at Bangladesh Exhibition
07/12/2022Tell us the ride type, site size and target opening date. We reply within one working day.