In short: Yueton started production of 10 large Christmas tree rides in April 2026 for buyers in different countries, each with its own gondola colour scheme.
Zhengzhou, April 10, 2026 – Although Christmas is still more than eight months away, the production workshop of Zhengzhou Amusement Equipment Co., Ltd. is already bustling with activity. The company officially launched the production of 10 large Christmas tree amusement rides, each destined for customers in different countries.
Each customer conducted a thorough comparison of multiple global suppliers before visiting Zhengzhou for a rigorous factory audit. The visiting customers were impressed by the company’s production qualifications, safety standards, and exquisite craftsmanship. Most customers paid deposits on the spot, expressing great satisfaction with the product quality.
One of the key factors contributing to these orders is product quality. Strict control over raw material quality is maintained throughout the production process. To achieve hydraulic stability in the cabins, the technical team worked day and night, and now the hydraulic cabins are fully stable. To meet the diverse aesthetic preferences of different national markets, the colors of the gondolas on these Christmas trees can be completely customized according to each customer’s requirements, breaking through traditional color schemes.
Ten Christmas tree rides in production at once, each for a different country, is only possible because the colour of the gondolas is decided per order. The structure is common; the cabins, decorative balls and lighting are specified by the client. That is what stops ten units built in the same workshop from arriving in ten identical parks.
The technical work behind these units was hydraulic stability in the cabins — the part riders notice as a smooth rise rather than a jolt. Getting that right across a batch of ten is a testing job as much as a design job.
By late June 2026 the same batch had grown to thirteen sets in the workshop, with decorative balls, passenger cabins and simulated tree leaves in production across the lines. Building them in one run keeps the finish consistent across the batch and lets materials be ordered in the quantities the season needs. The window matters as much as the capacity: a set ordered in October cannot be built, shipped and installed before the European season starts.
Nicaragua Government Park Project
25/03/2025How To Choose And Install Bumper Car?
15/11/2024How To Invest In An Amusement Park Correctly?
14/10/2024The Installation Of Brave Turntable Ride In Indonesia
07/09/2024Zhengzhou Yueton Amusement Equipment Co., Ltd.’s Major Progress In Africa
30/08/2024Luxury Model Trackless Train
23/08/2024Yueton Amusement at Bangladesh Exhibition
07/12/2022Tell us the ride type, site size and target opening date. We reply within one working day.