News

Custom Diesel Trains for Brazil: Production & Delivery

In short: Five 72-seat Cummins diesel trains for a Brazilian government project have finished production, built as one batch with a single spare-parts list.

Zhengzhou Yueton has made significant progress on a government project with a Brazilian client, completing production of five 72-seat Cummins diesel-powered trains, with shipment scheduled.

Project at a glance:

  • Client: Brazilian government project
  • Trains: 5 x 72-seat Cummins diesel trains
  • Status: production complete, shipment scheduled

For high-capacity transport trains, we engineer, manufacture, and deliver complete units.

Why Diesel for a 72-Seat Train

A 72-seat train covering a long route cannot depend on a battery charge between circuits. Cummins diesel power removes the charging window and the cable infrastructure entirely, which matters where the track is laid out over a large site or where the power supply at the far end is unreliable. The cost moves to fuel and engine servicing, and for a government-operated park that is a budget line the operator already knows how to run.

Five Units in One Programme

Five identical trains built together means one set of drawings, one production run and one shipment. It also means the operator starts with a fleet of the same machine, so drivers and mechanics learn one vehicle rather than five, and the spare-parts list stays short.

Service in a Government Fleet

Five identical diesel trains mean one service schedule, one spare-parts list and one training programme for the operator’s mechanics. For a public-sector buyer that consistency is often worth more than a lower purchase price per unit, because the fleet has to be maintained by staff who may not have worked on amusement equipment before.

Home WhatsApp Mail Inquiry